Caldera de vapor de gas combustible/aceite de alta eficiencia 0,5~20 T/H con controlador inteligente
Aplicaciones de producción: suministro de vapor para aplicaciones industriales, suministro de agua caliente a través de
Descripción
Información básica.
N º de Modelo. | WNS0.5-20 |
Colocación del tambor | Caldera Horizontal |
Presión | Presión |
Estilo ardiente | Caldera de combustión de cámara |
Uso | Industrial |
Estructura de la caldera | Horizontal |
Material del tubo de fuego | GB3087 20, Igual Toasme SA210 |
Aislamiento | Lana de silicato de aluminio |
Revestimiento protector | Hoja de acero inoxidable o aluminio |
Diseño | 3 pases, espalda mojada, tubo de fuego |
Combustible aplicable | Gas, petróleo, combustible dual |
Material de la cáscara | GB713 Q245r, igual a Asme SA 516 |
Especificación de electricidad | 3/380/50, 3/400/60, 3/440/60, 3/220/60 |
Capacidad de la caldera | 35 caballos de fuerza ~ 1400 caballos de fuerza |
Ressure de trabajo nominal | 0,7~1,6 MPa (7 barras~16 barras) |
Paquete de transporte | Film estirable y cajas de madera |
Especificación | 0,5 t/h ~ 20 t/h |
Marca comercial | Devoción |
Origen | Cantón |
Código hs | 84021900 |
Capacidad de producción | 100 sistemas/mes |
Descripción del Producto
Aplicaciones de producción: suministro de vapor para aplicaciones industriales, suministro de agua caliente a través de intercambiadores de calor, suministro de vapor y agua caliente para aplicaciones comerciales como hoteles, hospitales, etc. LAS PRINCIPALES CARACTERÍSTICAS DE NUESTRA CALDERALas características de otros accesorios como la bomba de alimentación de agua y el quemador se proporcionarán lo antes posible previa consulta.
FAQQ1: Where is your company?A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.Q2: What is the Warranty for the boilers?A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. Q3: How about the installation and commissioning?A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers. Q4: What's the production lead time for delivery?A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc. Q5: What about your payment term?A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount. Q6: What kind of documents will be provided?A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request. Q7: What's your MOQ?A7: Only 1 set, if you have more than that, you will get a more favorable price. Q8: How's the packaging & shippingA8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.
Próximo: Oferta de fabricantes baja
Nuestro contacto
Enviar ahora